Situations - Categories

Parameters associated with run type categories are grouped under Categories Situation.

Situation Description
Number Sets the maximum/minimum number of runs for a combination of run types.

Run types are categorized depending on their length (number of hours) and the continuity of the work scheduled, (for example, six continuous hours of scheduled work).