Extra Shift

The Extra Shift rule is used when you are creating runs with more than one shift break. The rule has to be used in conjunction with the Extra Break Time rule. In Block Optimizer, if you don’t have an extra break you cannot have an extra shift.

Parameter Description
Extra shift minimum The minimum length of the extra shift.
Extra shift maximum The maximum length of the extra shift.