Editing a Scheduled Job
When a scheduled job needs to be updated, it can be edited.
Before you begin
Procedure
-
Select a job from the grid.
The settings of the job record are shown in the lower section of the dialog box.
-
Click Edit.
The fields in the Job Schedule frame become active.
- Update the fields as required.
-
Click Job Data.
The Job Data dialog box appears.
-
Select the job step to be edited.
All steps in a job must operate on the same schedule.
-
Click Edit.
A dialog box appears.
- Edit the job details as needed.
- Click Apply.
-
Click OK.
The dialog box closes.
- In the Job Data dialog box, click OK.
- In the Schedule Job Agent dialog box, click Save.