Batch Scheduling Evacuation Trips
Multiple evacuation trips can be scheduled at one time.
Before you begin
Procedure
- On the Evacuation Trips tab, select the trips to be scheduled.
- In the Evacuation step, click the Batching tab.
-
Provide the following information as needed:
- Preferred Runs
- Select all or specific runs on which to schedule runs:
- Click the ellipsis button [...] beside the text field. The Runs Selections dialog box appears.
- (Optional) In the upper half of the dialog box, search for the runs by typing the Run Id and Run Name, and then clicking Search.
- In the Search Results pane, click the runs to use, and then click > to add them to the Selected pane. Alternatively, press Ctrl + A to select all runs, and then click < to remove unwanted runs.
- Click OK.
- Schedule Booking with No Request Time
- Select whether to schedule bookings that do not have a requested pick-up or drop-off time.
- Violation Set
- Click a violation set in the list.
- Parameter Set
- Click a parameter set in the list.
- Use Group Optimizer
- Select whether to use the group optimizer to ensure that trips are scheduled efficiently by scheduling nearby clients with similar trip times together.
- Schedule the Unscheduled Bookings
- Select whether to schedule unscheduled bookings.
-
Click the Start Batching button to begin scheduling the
trips:

-
To update the list, in the Evacuation Trips tab, click the
Refresh button:

The client's status in the Schedule Status column is changed from U (unscheduled) to S (scheduled).