Adjusting Calculated Run Times

Calculated run times are based on previously geocoded information and on the assumption that the vehicle travels an uninterrupted path.

Adjust these calculations to reflect actual traffic changes as necessary. For example, add time to account for traffic delays.
  1. In the middle frame of the Set tab, select the node to node pair for which you want to change the run time. The run time of the selected pair appears in the Run Time field.
  2. In the Run Time field, click the number shown and overwrite it with the new time.
  3. To apply the change, click the node to node pair in the middle frame associated with the run time.
  4. For the other run times you want to change, repeat steps 1 to 3.
  5. Click Apply.
    The run times for the selected node to node pairs are changed on the Run Times tab.
  6. Click Close.
    CAUTION: When changing or updating run times, you should always use caution as it will affect the integrity of existing trips that may have been built using these run times.