About the OPS Weekly Roster Screen
The OPS Weekly Roster screen lets you to manage rosters and employee assignments.
OPS Weekly Roster is used to gather open work and extraboard work to be
assigned to extraboard operators as rosters.
Note: A hold-down is created for work previously
assigned to an absent employee.
Open work includes:
- Unbid runs
- Open rosters
- Work opened as a result of scheduled absences
Using the OPS Weekly Roster screen is a convenient way of assigning a
whole roster of work to an extraboard operator instead of assigning work
individually.
Note: These rosters aren't part of the bidding process. Weekly rosters involve
work outside of configuring and conducting a bid.
To assign employee to the work:
- Create the weekly roster
- Assign the weekly roster to an employee
- Roll out the weekly roster
| Button | Label | Description |
|---|---|---|
| Roll Out Weekly Roster | Rolls out the weekly roster. Once the roster is rolled out, changes can only be made in the Work Planner screen. | |
| Undo Roll Out Weekly Roster | Removes Work Planner assignments. | |
| Add Weekly Roster | Creates a new weekly roster. | |
| Modify Weekly Roster | Opens an existing roster for editing following the same procedure as in Add Weekly Roster. | |
| Delete Weekly Roster | Permanently deletes a weekly roster. | |
| Assign Employee | Assigns an employee to the weekly roster. | |
| UnAssign Employee | Removes an employee from a weekly roster. | |
| Reload Open Rosters | Reloads open rosters. Available if the property is cleared. Otherwise, rosters are automatically loaded. |