Deleting a Step from a Scheduled Job
When a scheduled job step is no longer needed, it can be deleted.
Before you begin
Procedure
-
Select a job in the grid.
The settings of the job record are shown in the lower section of the dialog box.
- Click Edit.
-
Click Job Data.
The Job Data dialog box appears.
- Select the job step.
-
Click Delete.
The job step is deleted.
- Click OK.
- Click Close.