About Build Weeks
The Build Weeks step allows you to show and edit selected runs in a worksheet grid.
It allows you to perform the following tasks:
- Filter the rows that are shown in the grid using the options to the left of the grid.
- See the details of each run in the grid, including calculated pay time.
- Sort the grid on any column. This sort is retained if the screen is closed and reopened.
- Change a run name, shift type, start time, or end time.
- Change lunch start or lunch end times.
- Calculate and show pay time for each run.
Optionally, calculate and show additional columns showing key pre-trip and post-trip clock times covered by driver work rules and included in pay time calculations.
- Assign a work (bid) number to each run.
For rostering, this is the bid pick number.
For cafeteria-style picking, the work number might be used to enter an employee id.
The lowest unused workid is shown for convenience.
- Add or delete a run.