Assigning Work in Rota Lines
Assign work to rota lines using the graphical interface.
- Open the Rota Manager screen and set the Context (F3).
- Select Add Rota Line.
- Click and drag over the day(s) you are assigning.
-
Right-click the selected days and select Assign
Work.
The Select Work dialog appears.
- In Work Selection, select the work source.
- In the work grid, select the work to assign.
- Select OK.
- Select Save.