Assigning Work in Rota Lines

Assign work to rota lines using the graphical interface.

  1. Open the Rota Manager screen and set the Context (F3).
  2. Select Add Rota Line.
  3. Click and drag over the day(s) you are assigning.
  4. Right-click the selected days and select Assign Work.
    The Select Work dialog appears.
  5. In Work Selection, select the work source.
  6. In the work grid, select the work to assign.
  7. Select OK.
  8. Select Save.