Updating Costing of Runs

The Update Costing stamps costing values to each legal run in the Cut Pieces grid.

It should be performed:
  • After you have initially cut your runs.
  • After you have altered an original run or made any Union Contract changes to improve your runcuts.
  • Before you run reports or other FX run interfaces that require run information.
  • Before you attempt any rostering (if applicable to your transit site).
    Note: Illegal runs do not have run types associated with them and therefore have a run type number of zero (0). These runs do not have proper costings stamped on them.
  1. Click Runcutting > Costing > Update Costing or click the Update Costing button: Update Costing button
    The Update Costing dialog box appears.
    Update Costing
  2. To update all your exceptions, select the All Exceptions check box.
  3. Click Start.
    The bar at the bottom of the dialog box shows the progress of the updating process.
  4. Click Close.