Using the Build Tab

After you have created at least one trip without patterns or run times, continue to build trips through the Build tab.

  1. On the Trips tab, select the trip on which you want to base the next set of trips.
  2. Click the Edit button:Edit button

    The Edit dialog box appears.

  3. Select the Build tab.
  4. Depending on the trips you want to build, select the Build From Trip check box or click Last Trip.
  5. If necessary, modify the data on the Build tab fields based on what you require.
  6. Click Apply.
  7. Click Close.