Restoring Runs

Runs that have been changed or split can be restored as needed.

The system restores the work's times to the times that existed when the day was first activated. If the work was split, the split pieces are rejoined.
  1. Open the Daily Activity screen and set the Context (F3).
  2. Select the piece of work to restore.
    If this is a split piece of work, select any one of the pieces.
  3. Select Restore Run: Restore Run

    To better see columns in the Restore Run dialog, resize the dialog or the individual columns.

    If the run can't be restored because required data isn't found, a message appears and the run is unchanged.